Infrastructure of the Department
- Fourteen fully functional operation theatres with 6 Workstations
- Laminar flow with HEPA filters in all operation theatres
- Well-furnished library
- 24 hour Internet facility
- Demo hall with 42 inches LED TV
- Museum
- Well-equipped preoperative rooms
- Well equipped recovery rooms with ventilators
- Fibreoptic Intubation Bronchoscope